Now the trees have been felled we checked them for ‘shake’ or ‘rot’ and measured the lengths needed for each part of the building. The logs were sprayed with cutting marks and identified for the various timbers needed such as tie beams, purlins and posts.
Next the timber will be taken in the log to Buckler’s Hard ready for hand conversion.
Our course in Hewing and Pit and Trestle sawing will start on 24th March and demonstrations for the public on the 2nd – 4th April. Sign-up, there are still places available.